Dam type: concrete gravity dam
Maximum dam height: 64m
Reservoir storage: 8.0×106m3
Power waterhead: 420m
Total installed capacity: 963MW
It is a high head diversiontype hydropower station on Neelum Jhelum River in A.J.Kashimir of Pakistan. The headrace tunnel is 28.578km long, while the tailrace is 3.5km long. The maximum power discharge is 280 m3/s. The underground powerhouse is equipped with four turbine-generator units, with the total installed capacity at 963MW.